2ý2ý3ý3ý2ý3ý3ý3ý3ý3ý3ý2ý3ý3ý3ý3ý2ý3ý3ý3ý2ý1ý3ý2ý2ý2ý3ý2ý3ý2ý3ý3ý3ý2ý1ý2ý3ý3ý3ý3ý3ý1ý3ý2ý3ý3ý3ý2ý3ý2ý3ý3ý3ý2ý2ý2ý2ý3ý2ý3ý3ý3ý2ý3ý3ý2ý2ý2ý1ý3ý1ý2ý2ý2ý2ý2ý1ý3ý3ý2ý3ý2ý3ý2ý3ý3ý3ý3ý3ý3ý3ý3ý3ý3ý1ý2þBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISýBCISþ5Lý6Cý2D2ý3C2ý5Ný5K2ý6C5ý5F9ý2C3ý5H3ý6C3ý5Hý2F2ý5J3ý6A3ý5F3ý5Fý4A1ý5D3ý6D2ý2Aý4ý5F1ý5Jý6Aý5Dý2C1ý4Aý5D1ý2Gý5F7ý5H1ý6C9ý5Bý8ý2Eý5F5ý6C7ý4A3ý5J1ý6A1ý2ý5C2ý3Bý6C1ý5J2ý6A2ý1Aý6C8ý5Aý6C2ý5F2ý6A4ý5Gý5Ký6Bý2Fý5D4ý5Eý5D2ý5H4ý6C6ý5Cý6C4ý5C1ý3Aý3Cý2Hý5ý5K1ý1ý2Bý5Iý5Mý6Dý7Aý3ý5K3ý5F6ý2Dý5F8ý5Oý5F4ý7ý4A4ý2F1ý4A2ý2D3ý2D1ý3C1ý2C4ý2C2ý5H2ý6D1ý6ý2CþCommunications installationsýExternal servicesýStair finishesýSuspended ceilingsýBuilders work in connection with servicesýFire-fighting installationsýElectric mainsýHeating and cooling (air heated centrallýRoof drainageýElectric lightingýHeating mainsýElectrical installationsýExternal doorsýConveyorsýSite enclosure and divisionýElectricity (heating only)ýSpace heating and air treatmentýFittings, fixtures and furnitureýHot water serviceýAlterations to existing buildingsýFrameýFITTINGS AND FURNISHINGSýWater and/or steam (heating only)ýLift and conveyor installationsýSite worksýWater installationsýRoof structureýFittings and furnishingsýMains supplyýInternal walls and partitionsýHeating with ventilation (air heated cenýElectric source and mainsýBuilders P&A on external servicesýServices equipmentýCONTINGENCIESýExternal wallsýOther heating systemsýOther mains and servicesýWorks of artýLifts and hoistsýSite preparationýSUPERSTRUCTUREýRefuse disposalýFloor finishesýWater mainsýEscalatorsýSurface treatmentýSubstructureýBWIC with external servicesýSanitary appliancesýFire mainsýDucted warm air (heating only)ýFittings and furnitureýVentilating systemsýProtective installationsýDrainageýWindows and external doorsýSteam and condensateýHeat sourceýCold water serviceýElectric light fittingsýSite lightingýDisposal installationsýGas mainsýInternal drainageýWall finishesýCeiling finishesýInternal doorsýSERVICESýSprinkler installationsýSUBSTRUCTUREýUpper floorsýGas installationýSpecial installationsýMinor building work and work in ancilliary to site worksýPrelimsýINTERNAL FINISHESýLightning protectionýHeating with ventilation (air heated locýStairsýHeating and cooling (air heated locally)ýBuilder's profit and attendance on servicesýLocal heatingýPRELIMINARIESýEquipmentýWindowsýSoft furnishingsýStair balustrades and handrailsýStair structureýFinishes to ceilingsýRoof lightsýRoof coveringsýElectric power suppliesýAncillary buildingsýEXTERNAL WORKSýRoofþM2ýM2ýM2ýM2ýITEMýM2ýM2ýM3ýM2ýM2ýM2ýM2ýM2ýM2ýM2ýM3ýM3ýNOýM2ýITEMýM2ýITEMýM3ýM2ýM2ýM2ýM2ýNOýM2ýM2ýM3ýM2ýITEMýNOýM2ýM2ýM3ýM2ýNOýM2ýM2ýM2ýM2ýM2ýM2ýM2ýM2ýM2ýITEMýNOýM2ýM3ýNOýM3ýM2ýM2ýM2ýM2ýM2ýM2ýM2ýM2ýNOýM2ýM2ýM2ýM2ýM2ýM2ýM2ýM2ýFT2ýM2ýM2ýITEMýNOýM2ýM2ýM3ýM2ýM3ýITEMýM3ýITEMýNOýM2ýNOýMýM2ýM2ýNOýM2ýM2ýITEMýM2ýM2þ5ý6ý2Dý3Cý5ý5Ký6Cý5Fý2Cý5Hý6Cý5ý2Fý5Jý6Aý5Fý5ý4Aý5Dý6Dý2ýý5Fý5ý6ý5ý2Cý4ý5Dý2ý5Fý5Hý6Cý5ýý2ý5Fý6Cý4Aý5Jý6Aýý5Cý3ý6Cý5Jý6Aý1ý6Cý5ý6Cý5Fý6Aý5ý5ý6ý2ý5Dý5ý5Dý5Hý6Cý5ý6Cý5Cý3ý3ý2ýý5Kýý2ý5ý5ý6ý6ýý5Ký5Fý2ý5Fý5ý5Fý6ý4Aý2Fý4Aý2Dý2Dý3Cý2Cý2Cý5Hý6Dýý2þThe following installations shall be included :-ûû Communication Installations Total £ Cost per m2 of gross floorû Area £ûWarning installations (Fire & Theft)ûBurglar and Security alarmsûûVisual and Audio installationsûDoor signalsûTimed signalsûCall signalsûClocksûTelephonesûPublic addressûRadioûTelevsionûPneumatic message systemsûûNOTES:ûû1. The cost of each installation shall be stated separately if possible along with an indication of the specificationûû2. The cost of the work in connection with electrical supply shall be included wih "Electric power supplies" (5.H.2)ýýFinishes to traeds, risers, landings (other than at floor levels), ramp surfaces, strings and soffits.ýConstrcution and finishes of suspended ceilings.ûûNOTES:ûû1. Where ceilings principally provide a source of heat, artificial lighting or ventilation, they shall be included with the appropriate "Services" element and the cost shall be stated separately.ûû2. The cost of finishes of suspended ceilings to soffits immediately below roofs shall be shown separately.ýBulder's work in connection with mchanical and elctrical services.ûûNOTES:ûû1. The cost of builder's work in connection with each of the services elements shall, where possible, be shown separately.ûû2. Where tank rooms, housings and the like are included in the gross floor area, their component parts shall be analysed in detail under the appropriate elements. Where this is not the case the cost of such items shall be included here.ýHosereels, hand extinguishers, asbestos blankets, water and sand buckets, foam inlets, dry risers (and wet risers where only serving fire-fighting equipment).ýMain from existing supply up to external face of building.ýAll work detailed under (5.F.8) for system where air treated centrallyûûNOTE:ûûWhere more than one system is used, design criteria specification notes and costs should be given for each.ýGutters where not integral with roof structure, rainwater heads and roof outlets. (Rainwater downpipes to be included in "Integral drainage" (5.C.1).ýAll wiring, cables, conduits, switches, etc., from local disribution boards and fittings to and including outlet points.ýMain from existing supply or heat source up to external face of building.ýýDoors, fanlights and sidelights.ûFrames, linings and trims.ûIronmongery and glazing.ûLintels, thresholds, cavity damp-proof courses and work to reveals of openings.ýAs detailed under 5.J.1ýGates and entranceûFencing, walling and hedgesýCable heatinf systems, off-peak heating systems, including storage radiators.ûûNOTE:ûûElectrically-operated heat emission units other than storage radiators should be included under "Local heating" (5.F.4).ýCube of treated space as defined Tm3ýFixed and loose fittings and furniture including shelving, cupboards, wardrobes, benches, seating, counters and the like. Blinds, blind boxes, curtain tracks and pelmets.ûBlackboards, pin-up boards, notice boards, signs, lettering, mirrors and the like. IronmongeryýHot water and/or mixed water services.ûStorage cylinders, pumps, calorifiers, instantaneous water heaters, distribution pipework to sanitary appliances and services equipment.ûValves and taps not included with "Sanitary appliances" (5.A) and/or "Services equipment" (5.B). InsulationýAlterations and minor additions, shoring, repair and maintenance to existing buildings.ýArea of floors relating to frame, measured as for gross internal floor area, (m2).ûûLoadbearing framework of concrete, steel or timber. Main floor and roof beams, ties and roof trusses of framed buildings. Casing to stanchions and beams for structural or protective purposes.ûûNOTES:ûû1. Structual walls which form an integral part of the loadbearing framework shall be included either with "External walls" (2.3) or "Internal walls and partitions" (2.G) as appropriate.ûû2. Beams which form an integral part of a floor or roof which cannot be segregated therefrom shall be inluded in the appropriate element.ûû3. In unframed buildings roof and floor beams shall be included with "Upper floors" (2.B) or "Roof structure" (2.C.1) as appropriate.ûû4. If the "Stair structure" (2.D.1) has had to be included in this element it should be noted separately.ýýHeat emission units (radiators, pipe coils, etc.)ûvalves and fittings, insturmentation and control and distribution pipework from "Heat source" (5.E).ýýýýConstruction, including eaves and verges, plates and ceiling joints, gable ends, internal walls and chimneys above plate level, parapet walls and balustrades.ûûNOTES:ûû1. Beams which form an integal part of a roof shall be included with this element.ûû2. Roof housings (e.g. lift motor and plant rooms) shall be broken down into the appropriate constituent elements.ýýIncoming water main from external face of external wall at point of entry into building including valves, water meters, rising main to (but excluding) storage tanks and main taps. InsulationýTotal area of internal walls and partitions (excluding openings), (m2)ûûInternal walls, partitions and insulation.ûChimneys forming part of internal walls up to plate level..ûScreens, borrowed lights and glazing.ûMoveable space-dividing partitions.ûInternal balustrades excluding items included with "Stair balustrades and handrails" (2.D.3)ûûNOTES:ûû1. The cost of structural walls which form an integral and important part of the loadbearing fromework shall be show separately.ûû2. The cost of proprietary partitioning shall be shown separately stating if self-finished.û Doors, etc., provided there in together with ironmongery, should be included stating the number of units installed.ûû3. The cost of proprietary W.C. cubicles shall be shown separately stating the number provided.ûû4. If design is cross-wall construction, the specification shall be stated and the cost shown separately.ýAll work as detailed under (5.F.6) for system where air treated centrally.ýAll work from external face of building up to and ncluding local distribution boards including main switchgear, main and sub-main cables, control gear, equipment, earthing, etc.ûûNOTES:ûû1. Installations for electric heating ("built-in" system) shall be included with "Space heating and air treatment" (5.F.3)ûû2. The cost of stand-by equipment shall be stated separately.ýýKitchen, laundry, hospital and dental equipment, and other specialist mechanical and electrical equipment related to the function of the building.ûûNOTE:ûûLocal incinerators shall be included with "Refuse Disposal" (5.C.2).ýýArea of external walls measured on outer face (excluding openings), (m2).ûûExternal enclosing walls including that to basements but excluding items with "Roof structure" (2.C.1)ûChimneys forming part of external walls up to plate level.ûCurtain walling, sheeting rails and cladding.ûVertical tanking.ûInsulation.ûApplied external finishes.ûûNOTES:ûû1. The cost of structural walls which form an integral and important part of the loadbearing framework shall be shown separately.ûû2. Basement walls shall be shown separateley and the quantity and cost given for each form of construction.ûû3. If walls are self-finished on internal face, this shall be stated.ý(ii) Air Treatment:-ûûNOTES:ûû1. System described as having:û "Air treated locally" shall be deemed to include all systems where air treatment (heating or cooling) is performed either in or adhacent to the space to be treatedû "Air treated centrally" shall be deemed to include all systems where air treatment (heating or cooling) is performed at a central ppoint and ducted to the space being treated.ûû2. The combination of treatments used shall be stated, i.e.:-û Heating Dehumidification or dryingû Cooling Filterationû Humidification Pressurisationû and whether inlet extract or recirculation.ûû3. High velocity system shall be identified as:-û Fan Coil Induction Units 2 pipeû Dual duct " " 3 pipeû Reheat " " 4 pipeû Multi-zone Any other system (state which).ýMains relating to other service installations (each shown separately.)ýWorks of art if not included in a finishes element or elsewhere.ûûNOTE:ûûWhere items in this element have a significant effect on other elements a note should be included in the appropriate element.ýThe complete installation including gantries, trolleys, blocks, hooks and ropes, downshop leads, pendant controls and electrical work from and including isolator.ûûNOTES:ûû1. The cost of special structural work, e.g. lift walls. lift motor rooms, etc., shall be included in the appropriate structural elements.ûû2. Remaining electrical work shall be included with "Electric power supplies" (5.H.2).ûû3. The cost of each type of lift or hoist shall be stated separately.ýClearance and demolitionsûPreparatory earth works to form new contoursýýRefuse ducts, waste disposal (grinding) units, chutes and bins.ûLocal incinerators and flues thereto.ûPaper shredders and incinerators.ýTotal area of floor finishes, (m2).ûûPeparatory work, screeds, skirtings and finishes to floor surfaces excluding items included with "Stair finishes" (2.D.2), and structural screeds included with "Upper floors" (2.B).ûûNOTE:ûûWhere the floor construction does not otherwise provide a platform the flooring surface will be included either in "Substructure" (1.A) or "Upper floors" (2.B) as appropriate.ýMain from existing supply up to external face of buildingýAs detailed under 5.J.1ýThe cost of the following items shall be stated separately if possible:-ûûRoads and associated footwaysûVehicle parksûPaths and paved areasûPlaying fieldsûPlay groundsûGames courtsûRetaining wallsûLand drainageûLandscape workýArea of lowest floor measured as gross internal floor area, (m2).ûûAll work below underside of screed or where no screed exists to underside of lowest floor finish including damp-proof membrane, together with relevant excavations and foundations.ûûNOTES:ûû1. Where lowest floor construction does not otherwise provide a platform, the flooring surface shall be included with this element (e.g. if joisted floor, floor boarding would be included here).ûû2. Stanchions and columns (with relevant casings) shall be included with "Frame" (2.A).ûû3. Cost of piling and driving shall be shown seperately stating system, number and û average length of pile.ûû4. The cost of external enclosing walls to basements shall be included with "External walls" (2.E) and stated separately for each form of construction.ýBuilders work in connection with external mechanical and electrical serivces: eg pits, trenches, ducts, etc.û 6.C.1û 6.C.2û 6.C.3û 6.C.4û 6.C.5û 6.C.6û 6.C.7ûNOTE:ûûThe cost of profit and attendance shall be stated separately for each of the sub-sections (6.C.1) to (6.C.7)ýBaths, basins, sinks, etc.ûW.c's, slop sinks, urinals and the like.ûToilet-roll holders, towel rails, etc.ûTraps, waste fittings, overflows and taps as appropriate.ýMain from existing supply up to external face of building; fire hydrants.ýDuctwork, grilles, fans, filters, etc., insturmentation and control.ýNotice boards, flag poles, seats, signsûýCube of treated space as defined ---- Tm3ûûMechanical ventilating system not incorporating heating or cooling installations including dust and fume extraction and fresh air injection, unit extract fans, rotating ventilators and instrumentation and controls.ýýSurface water drainageûFoul drainageûSewage treatment.ûûNOTE:ûûTo include all drainage works (other than land drainage included with "Surface treatment" (6.A.2) outside the building to and including disposal point, connection to sewer or to treatment plantýTotal area of windows & external doors measured over frames, (m2).ýSteam distribution and condensate return pipework to and from services equipment within the building including all valves, fittings, etc. Insulation.ûûNOTE:ûûSteam and condensate pipework installed in connection with space heating or the like shall be included as appropriate with "Heat source" (5.E). or "Space heating and air treatment" (5.F).ýKW (kilowatts)ûûBoilers, mounting, firing equipment, pressurising equipment instrumentation and control, I.D. and F.D. fans, gantries, flues and chimneys, fuel conveyors and calorifiers. Cold and treated water supplies and tanks, fuel oil and/or gas supplies, storage tanks, etc., pipework (water or steam mains) pumps, valves and other equipment. InsulationûûNOTES:ûû1. Chimneys and flues which are an integral part of the structure shall be included with the appropriate structural element.ûû2. Local heat source shall be included with "Local heating" (5.F.4)ûû3. Where more than one heat source is provided each shall be analysed seperately.ýStorage tanks, pumps, pressure boosters, distribution pipework to sanitary appliances and to services equipment.ûValves and taps not included with "Sanitary appliances" (5.A) and/or "Services equipment" (5.B). Insulation.ûûNOTE:ûûHeader tanks, cold water supplies, etc., for heating systems should be included in "Heat source" (5.E).ýLighting fittings including fixing.ûWhere lighting fittings supplied direct by client, this should be stated.ýDistribution, fittings and equipment.ýýMain from existing supply up to external face of building.ýWaste pipes to "Sanitary appliances" (5.A) and "Services equipment" (5.B).ûSoil, anti-syphonage and ventilation pipes.ûRainwater downpipes. Floor channels and gratings and drains in ground within buildings up to external face of external walls.ûûNOTE:ûûRainwater gutters are included in "Roof drainage" (2.C.3).ýTotal area of wall finishes, (m2).ûûPreparatory work and finishes to surfaces of walls internally. Picture, dado and similar rails.ûûNOTES:ûû1. Surfaces which are self-finished (e.g. self-finished partitions, fair faced work) shall be included in the appropriate element.ûû2. Insulation which is a wall finishing shall be included here.ûû3. The cost of finishes applied to the inside face of external walls shall be shown separatelyýTotal area of ceiling finishes, (m2).ûûýArea of internal doors measured over frames, (m2).ûûDoors, fanlights and sidelights.ûSliding and folding doors.ûHatches.ûFrames, linings and trims.ûIronmongery and glazing.ûLintels, thresholds and work to reveals of openings.ýýThe complete sprinkler installation and CO2 extinguishing system including tanks control mechanism, etc.ûûNOTE:ûûElectrical work shall be included with "Electrical power supplies" (5.H.2).ýýTotal area of upper floors, (m2).ûûUpper floors, continuous access floors, balconies and structural screeds (access and private balconies aeach stated seperately), suspended floors over or in basements stated separately.ûûNOTES:ûû1. Where floor construction does not otherwise prvide a platform the flooring surface shall be included with this element (e.g. if joisted floor, floor boarding would be included here).ûû2. Beams which form an integral part of a floor slab shall be included with this element.ûû3. If the "Stair structure" (2.D.1) has had to be included in this element it should be noted separatelyýTown and natural gas services from meter or from point of entry where there is no individual meter; distribution pipework to appliances and equipment.ýAll other mechanical and/or electrical installations (separately idenftifiable) which have not been included elsewhere, e.g. Chemical gases; Medical gases; Vacuum cleaning; Window cleaning equipment and cradles; Compressed air; Treated water; Refrigerated stores.ûûNOTES:ûû1. The cost of each installation shall, where possible, be shown separately along with an indication of the specification.ûû2. Items deemed to be included under "Refigerated store" comprise all plant required to provide refrigerated conditions (i.e. cooling towers, compressors, instrumentation and controls, cold room thermal insulation and vapour sealing, cold room doors, etc.) for cold rooms, refrigerated stores and the like other than that required for "Space heating and air treatment" (5.F.8 and 5.F.9).ýýýýThe complete lightning protection installation from finials conductor tapes, to and including earthing.ûûNOTE:ûûThe cost of lightning protection to boiler and vent stacks be stated separately.ýDistribution pipework ducting, grilles, heat emission units incuding heating clorifiers except those which are part of "Heat source" (5.E) instrumentation and control.ýýAll work as detailed under (5.F.6) including chilled water systems and/or cold or treated water feeds. The whole of the costs of the cooling plant and distribution pipework to local cooling units shall be shown separately.ýBuilder's profit and attendance in connection with mechanical and electrical services.ûûNOTE:ûûThe cost of profit and attendance in connection with each of the services elements shall, where possible, be shown separately.ýFireplaces (except flues), radient heaters, small elctrical or gas appliances, etc.ýPriced items in Preliminaries Bill and Summary but excluding contractors' price adjustments.ûIndividual costs of the main preliminary items should be given.ûûNOTES:ûû1. Professional fees will not form part of the cost analysis.ûû2. Lump sum adjustments shall be spread pro-rata amongst all elements of the building and external works based on all work excluding Prime Cost and Provisional Sums.ýNon-mechanical and non-electrical equipment related to the function or need of the building (e.eg. gymnasia equipment).ýSashes, frames, linings and trims.ûIronmongery and glazing.ûShop fronts.ûLintels, sills, cavity damp-proof courses and work to reveals of openingsýCurtains, loose carpets or smilar soft furnishing materials.ýBalustrades and handrails to stairs, landings and stairwellsýConstruction o ramps, stairs and landings other than at floor levels.ûLadders.ûEscpae staircases.ûûNOTES:ûû1. The cost of external escape staircases shall be shown separately.ûû2. If the staircase structure has had to be inlcuded in the elements "Frame" (2.A) or "Upper floors" (2.B) this should be statedýPreparatory work and finishes to surfaces of soffits excluding items included with "Stair finishes" (2.D.2) but inlcuding sides and soffits of beams not forming part of a wall surface.ûCornices, coves.ýRoof lights, opening gear, frame, kerbs and glazing.û Pavement lightsýRoof screeds and finishings. Battening, felt, slating, tiling, and the like.ûFlashings and trims.ûInsulation.ûEaves and verge treatment.ýAll wiring, cables, conduits, swithes from local distribution boards, etc., to and including outlet points for the following :-ûû Electric Power supplies Total £ Cost per m2 of grossû floor areaû General purpose socket outletsû Services equipmentû Disposal installationsû Water installationsû Heat sourceû Space heating and air treatmentû Gas installationû Lift and conveyor installationsû Protective installationsû Communication installationsû Special installationsûûNOTE:ûûThe cost of the power supply to these installations should, where possible, be shon separately.ýSeparate minor buildings such as sub-stations, bicycle stores, horticultural buildings and the like, inclusive of local engineering services.ýýArea measured as of roof area definition, (m2).þ005012000000000ý006003000000000ý002004002000000ý003003002000000ý005014000000000ý005011002000000ý006003005000000ý005006009000000ý002003003000000ý005008003000000ý006003003000000ý005008000000000ý002006002000000ý005010003000000ý006001003000000ý005006003000000ý005006000000000ý004001001000000ý005004003000000ý006004002000000ý002001000000000ý004000002000000ý005006001000000ý005010000000000ý006001000000000ý005004000000000ý002003001000000ý004001000000000ý005004001000000ý002007000000000ý005006007000000ý005008001000000ý006003009000000ý005002000000000ý007000000000000ý002005000000000ý005006005000000ý006003007000000ý004001003000000ý005010001000000ý006001001000000ý002000000000000ý005003002000000ý003002000000000ý006003001000000ý005010002000000ý006001002000000ý001001000000000ý006003008000000ý005001000000000ý006003002000000ý005006002000000ý006001004000000ý005007000000000ý005011000000000ý006002000000000ý002006000000000ý005004004000000ý005005000000000ý005004002000000ý005008004000000ý006003006000000ý005003000000000ý006003004000000ý005003001000000ý003001000000000ý003003000000000ý002008000000000ý005000004000000ý005011001000000ý001000000000000ý002002000000000ý005009000000000ý005013000000000ý006004000000000ý006006000000000ý003000000000000ý005011003000000ý005006006000000ý002004000000000ý005006008000000ý005015000000000ý005006004000000ý006005000000000ý004001004000000ý002006001000000ý004001002000000ý002004003000000ý002004001000000ý003003001000000ý002003004000000ý002003002000000ý005008002000000ý006004001000000ý006000000000000ý002003000000000